email [email protected] | +86-21-58386189

Application of Construction Waste in Road Engineering

Construction waste is misplaced resources

Use of construction waste In Road

  • The base layer of a motorized Lane;
  • The base of a pervious sidewalk;
  • Urban Road Base which the old pavement is crushed to be recycled aggregate.
Road Engineering

Realize the scale of construction waste

The treatment process of brick-and-garbage construction waste mainly includes five steps:

(1) Sorting and cleaning

(2) Prescreening

(3) Crushing: The large-size construction waste materials are processed into recycled aggregates with particle sizes that meet the requirements of the specification. According to the particle size requirements of recycled aggregates, Choose the right construction waste crusher for primary and secondary crusheing;the crushing process should be accompanied by magnetic separation. Process, separating steel, iron scrap and other substances;

(4) Light material sorting

(5) Screening

Related Articles

Hot Product